FMEPM Connect is live, in beta. Claude, connected to your Oracle EPM. Free for thirty days →

Oracle Planning consulting for PBCS and EPBCS

Build a Planning application your finance team can use, or improve the one slowing it down. I implement PBCS and EPBCS modules, fix slow calculations and spreadsheet workarounds, and keep budgeting and forecasting running month after month. You work directly with me, start to finish. Every change is validated against agreed results before finance accepts it.

FMEPM is a senior-led Oracle EPM consulting practice based in Ontario, Canada: Oracle Planning (PBCS and EPBCS) module implementations, performance reengineering, and managed services for finance teams worldwide, led directly by Fred Mamadjanov, Oracle ACE Pro.

Discuss my Planning project →

Prefer to write first? Describe your Planning issue.

The first step is a free 30 minute conversation about your environment, the problem and the scope, and whether I am the right fit. Any detailed assessment is scoped separately.

Delivered by: Oracle ACE Pro · Oracle Planning (PBCS) Certified · Oracle FCC Certified · Oracle PCM Certified · Toronto, Canada. Serving clients worldwide
When this is for you

When Oracle Planning isn't pulling its weight

The same few problems come up in most of the applications I am asked to look at.

Calculations that run so long they are scheduled overnight. Business rules that fail at full volume or overwrite manual adjustments. Metadata that has drifted from the chart of accounts. Forms that take minutes to open. Data moved by hand between cubes, or between Planning and the ERP. Users emailing spreadsheets because the form does not do what they need. None of these need a rebuild. They need the cause found and fixed, with the numbers checked side by side.

Whether you are starting fresh, replacing spreadsheets, or rescuing a system that has drifted, I work directly on the model, the rules, and the data flow until finance can rely on it again.

What I check first

Rule run times and what each rule touches. Outline and dimension design. Form size and the cells it loads. Data flows in and out of the application. What users do outside the system to get their work done.

Oracle Planning

What Oracle Planning consulting covers

Three ways to work together: implement or extend, improve what you have, or keep it running month to month.

PBCS EPBCS Essbase Groovy Smart View EPM Automate Data Integration Financials Workforce Capital Projects

Implement or extend Planning. Financials, Workforce, Capital or Projects added to an application you already run, or a new application with one or two modules in scope. Defined scope, integrations, validation against your numbers, documented handover. For a full multi module program across regions I join as the Planning architect alongside your partner firm.

Improve an existing application. Slow rules, failed calculations, heavy forms, manual data movement, a model that has drifted from the business. Diagnosis first, then a targeted fix, with results compared against the previous numbers before finance accepts them.

Ongoing Planning support. Administration, enhancements, troubleshooting, and a review of every Oracle monthly release against your environment. Month to month, the same architect every month.

Delivered

Planning rules rescued for an engineering firm: the most used rules simplified and rewritten in Groovy, a failing calculation given a documented root cause, an audit trail on save.

Workforce rules and a Fusion PFM integration for a government organization: calculations from hours to minutes, rules that run on save, a two way integration with Oracle Fusion Project Financial Management.

A Planning application reimplemented for an energy operator: business rules from multi hour runs to seconds, forecast consolidated through FCC and brought back.

Oracle EPBCS support for universities in Canada and the United States.

Finance Executive, higher education and public sector, Oracle EPBCS

"Fred supported my team responsible for managing a $1 billion budget. He combines excellent technical skills with a highly client-focused approach. With Fred's support we seamlessly managed monthly software updates and system enhancements. My team loved working with Fred."

What's included

New implementation

End-to-end setup: dimension design, driver-based logic, forms, business rules, reports, and integrations, through to go-live.

Performance reengineering

Business rule analysis, Essbase outline review, and form optimization. Most performance issues resolve without rebuilding the application.

Ongoing administration

Metadata changes, new forms, new rules, new users, and monthly patch reviews. The same senior architect month after month.

Monthly release reviews

Oracle ships EPM updates monthly. I test what matters against your environment and tell you what changed, what to use, and what to ignore.

Hyperion migration

Migration from on-premise Hyperion Planning to Oracle Cloud EPM, led with a vetted senior Oracle EPM architect from my network: existing rules, metadata and integrations mapped to their cloud equivalents, results validated before cutover.

Model redesign

When the planning model has drifted from the business, a targeted redesign restores dimensionality, driver logic, and data flow.

Groovy automation

Custom Groovy rules for calculations, validations, and data integration that standard configuration cannot reach.

Admin training and handover

Hands-on training for your admin team, with documentation written for the people who maintain the system.

Typical timeline: 10 to 16 weeks for a full implementation, 2 to 6 weeks for focused reengineering. Managed services run month to month.

How an engagement works

From first conversation to a system your team owns

1

Discovery

A free 30 minute conversation. We talk through your planning process, the current system if you have one, and what good looks like for finance.

2

Scope and plan

A clear scope with deliverables, timeline, and what your team needs to provide. Fixed where it can be.

3

Build or fix

Hands-on work on the model, rules, forms, and integrations, with you seeing progress as it happens.

4

Handover

Training, documentation, and a clean handover, so your team owns the system after I leave.

Related

Other Oracle EPM work

Planning often sits next to consolidation and profitability. Here is where the related work lives:

Oracle Planning consulting. Frequently asked.

Straight answers to what buyers and finance teams ask most.

What is Oracle Planning (PBCS and EPBCS)?+
Oracle Planning is the cloud platform for financial and operational planning. PBCS is the Planning and Budgeting Cloud Service. EPBCS is the enterprise version, with prebuilt modules for financials, workforce, capital, and projects. Both run annual budgets, rolling forecasts, and scenario models on a single governed platform.
How long does an Oracle Planning implementation take?+
A focused implementation usually runs 10 to 16 weeks, depending on the number of modules, integrations, and entities. Performance reengineering on an existing system is shorter, often 2 to 6 weeks. I give you a timeline tied to confirmed scope, not a vague estimate.
Our Oracle Planning is slow. Can it be fixed without rebuilding?+
Usually, yes. Most performance problems trace to business rules, Essbase outline design, or heavy forms, and they resolve with a targeted reengineering pass. A full rebuild is rarely necessary.
Can you migrate our Hyperion Planning to Oracle Cloud EPM?+
Yes, with a vetted senior Oracle EPM architect from my network beside me: at least ten years in Oracle EPM, based in the United States or Canada. I lead the mapping of metadata, business rules and integrations to their cloud equivalents and the validation that results tie out before cutover; the architect builds with me.
What is the difference between PBCS and EPBCS?+
PBCS is the core Planning and Budgeting Cloud Service. EPBCS adds Oracle's prebuilt planning modules, which speed up delivery when your needs match the framework. I help you choose the right fit rather than over-buying.
Do you offer ongoing Oracle Planning administration?+
Yes. Many clients keep me on month to month for metadata changes, new forms and rules, user management, and monthly patch reviews. The same senior architect stays with the system rather than a rotating team.
Do you implement Oracle Planning modules, or only fix existing applications?+
Both. I implement single modules and focused Planning applications directly: Financials, Workforce, Capital or Projects added to an application you already run, or a new Planning application with one or two modules in scope, in 10 to 16 weeks. I also reengineer and rescue applications built by others, and run managed services after go-live. What I do not do alone is a multi module program across regions with an ERP rollout alongside it; on those I join the partner leading the program as the Planning architect.
Is FMEPM a consulting firm or an independent consultant?+
FMEPM is a small consulting practice in Ontario, and I lead every engagement myself. For Oracle EPM I work two ways: directly for finance teams on single module implementations, reengineering, rescue and managed services, and alongside consulting firms and system integrators as a senior architect on larger programs. The person you meet at discovery is the person who designs and builds the application. Either way you get documentation written as the build goes, recorded walkthroughs your team keeps, and every change proven side by side against the previous numbers.
What happens if you are unavailable during my project?+
Two things protect the project. First, the build is documented as it goes: design decisions, integration setup, rule logic and admin steps are written down and recorded on screen, so nothing lives only in my head. Second, I work with a small network of senior EPM architects I have delivered with before, and one of them is briefed to step in on an NSPB or Planning project if I cannot continue. The documentation is what makes that possible.
Do you work with companies outside Canada?+
Yes. Oracle EPM and NSPB work is delivered remotely for finance teams in Canada, the United States, Europe and Australia, with on-site time when a project needs it. My working window runs 6 AM to 8 PM Eastern, Monday to Friday. Within it I keep 11 AM to 5 PM London time for European clients and 8 AM to 5 PM Pacific for the US West Coast. Statutory items such as tax, VAT and local reporting live in your ERP and stay with your ERP partner. The planning application works across subsidiaries and currencies on top of the actuals the ERP already holds, so the project does not need an office in each country.

Implementing Oracle Planning, or fixing one that drags?

Tell me where your planning process stands and where it hurts. I will tell you straight whether I can help.

Discuss my Planning project →